For my Facebook fans you already know about this great feature. But for those of you that are not connected to A Lean Journey on Facebook or Twitter I post daily a feature I call Lean Tips.  It is meant to be advice, things I learned from experience, and some knowledge tidbits about Lean to help you along your journey.  Another great reason to like A Lean Journey on Facebook.



Here is the next addition of tips from the Facebook page:

Lean Tip #136 - It is easy to think that inventory solves production flow problems but in fact it just hides them.
Inventory occurs for a variety of reasons:

•The upstream process moves faster than the downstream process.
•Goods flowing from several lines to one process or goods waiting to go from one process to several different lines tend to pile up.
•There is waiting for machine changeover.
•Materials are purchased and processed for expected end-of-the-month rushes.
•Spare parts are purchased in advance for after-sales service.

Inventory adds cost without adding value.

Lean Tip #137 - Inspection identifies and eliminates defects from the production flow.
Inspection identifies and eliminates defects from the production flow. It does not add value because it does not eliminate the source of the defect but only its result. Once you change your focus from "finding" defects to "reducing" defects you are on your way to eliminating waste. Ultimately, lean production aims to prevent all defects from occurring.

Lean Tip #138 - Identifying and eliminating waste increases job satisfaction.
No longer will you spend hours looking for missing tools, waiting for materials to arrive, walking around piles of inventory, lifting and setting down heavy parts or tools, working in unsafe conditions, and all the other things you have to do that aren't essential to your job. When you identify and eliminate waste the frustrating non-value added aspects of your job will disappear.

Lean Tip #139 - In order to balance capacity and load without overproducing, you must implement advanced Lean production.
In order to balance the capacity and load without overproducing, you must implement the advanced methods of Lean production:

•Line balancing
•One-piece flow
•Pull production using kanban
•Quick-changeover operations
•Level production - small lots, mixed production

Overproduction is the worst of the seven wastes; it is the exact opposite of just-in-time production.

Lean Tip #140 - If you want the ability to see waste you must adopt the necessary attitude.
You must adopt an attitude that supports your ability to see waste. Waste is hard enough to find when you wan to find it; if you don't want to find it, or if your response to finding it is denial or resistance, then it will never be possible for you to root out waste and make your environment stress free.

Lean Tip #141 - Remember three essentials for fact finding.
Remember three essentials for fact finding. (1) Go to where the problem occured. (2) See the problem first-hand. (3) Confirm the facts based on your own observations.

Lean Tip #142 - Be a walker and an observer in your factory.
Supervisors and managers must continually walk through the factory to see that standards are being followed and to practice seeing waste. Operators need to continually examine their own operations to stay alert for new problems and new ideas for solving them that may come to mind as they do their jobs.

Lean Tip #143 - Look with the eyes of a child.
Young children looking for answers in their surroundings are always asking why. All improvement begins with the first why. Never cease looking and never cease asking that first why. As you practice this, the rest will follow.

Lean Tip #144 - Standards must be continually and systematically updated or waste will enter your operation.
One way waste enters into operations is when standards are not improved to meet changing conditions. Even standardization fails to sustain waste-free production if not systematically updated to take advantage of new materials, new technology, and worker improvement ideas. If the slightest defect occurs, the standard must be reconsidered.

Lean Tip #145 - Bring latent wast to the surface by implementing single piece flow.
If you are having difficulty finding waste, or there is no motivation to do so, you can jump-start the situation by introducing single-piece flow. Don't wait for the right conditions, just put it in place with the current conditions in one line. Suddenly, latent waste will be obvious to everyone.

Lean Tip #146 - There are three element needed to establish standardized work.
There are three elements of standardized work:

1.Takt Time: the rate at which we must produce a product or service to meet the customer demand.
2.Work Sequence: the best way and the order we know to do the work today.
3.Standard-work-in-process: the amount of inventory necessary to allow takt rate to be met and the worker to be successful in performing to the standard each time.

Lean Tip #147 - Implementing visual systems create a number of benefits for your organization.
Implementing visual systems in your organization create a number of benefits including:

•Workers can take command of their daily work
•Visual systems provide a common work language even when spoken languages differ
•Low cost and simple solutions
•Perserves key resources for other work
•Makes it easier for Managers to "see" abnormal condition in the processes they are responsible for

Lean Tip #148 - Increase your understanding of the power of visual systems with a Gemba walk.
Take a Gemba walk through your business. Make a list of all the visuals you see, categorize them by type (indicator, signal, control) and note how and where they are used. Can you think of any other places these visual methods could be used in your company?

Lean Tip #149 - Go to the production floor and look at the paperwork when trying to create continuous flow.
Walk the production floor and look at the paperwork for about 10 orders that are in WIP. Document the lot size for each order. Ask why the lot size is the size it is. If you were to cut the lot size in half what would happen.

Lean Tip #150 - Continuous flow uncovers a number of opportunities in your value stream.
The key advantages of continuous flow are:

•Shorter lead-times and less work-in-process inventory
•Easier to identify defects and process problems
•Keeps workers focused on value-added work and makes it easier to see where they are needed
•Allows for faster feedback and improves communication when problems arise
•Reduces many of the seven wastes associated with batch production


Stay connect to A Lean Journey on our Facebook page or LinkedIn group.
Follow me on Twitter or connect with me on Linkedin
You can also subscribe to this feed or email to stay updated on all posts.

Friday, February 25, 2011

Lean Quote: Catching People Doing Things Right

On Fridays I will post a Lean related Quote. Throughout our lifetimes many people touch our lives and leave us with words of wisdom. These can both be a source of new learning and also a point to pause and reflect upon lessons we have learned. Within Lean active learning is an important aspect on this journey because without learning we can not improve.


"The secret is to catch him doing things right. Shine a light on what is right.  It's also very important to catch him doing things better, praise progress (something better) immediately and specifically." — Dave Yardley, Shamu's trainer from Sea World

This is a great quote that comes from a story about training Shamu to do those big tricks you see at Sea World. We aren't training killer whales but this still relates to business. Our job is to build positive relationships, increase people's energy, and improve performance on the job.

Try these steps next time you catch someone doing something right:

1. Pull the person aside immediately after you observe his or her good perfomance - or as soon as practically possible.

2. Tell the person what he or she did right.  Be specific.

3. Tell the person what his or her good performane will contribute to the kind of teamwork that we want to create.

4. Let the person know how good you feel about him or her.  Let your pride and appreciation show.

5. Stop for a moment to let it sink in.

6. Encourage the person to keep it up.  Ask how you can assist him or her to keep it up.  Offer the assistance that you can.

and if you want to create a new culture of doing things right

7.  When you receive praise, respond with a "Thank You."  Encourage the person who "caught you doing things right" to keep noticing. Try to return the favor!

Continually pay attention and observe to catch people doing something right or even better and praise that specifically and immediately.  When attention goes to what is right, energy flows to continue doing more of what is right.  When it's incorrect or mistakes occur, redirect or rechannel the energy so that you can praise progress or what's right specifically and immediately.



Stay connect to A Lean Journey on our Facebook page or LinkedIn group.
Follow me on Twitter or connect with me on Linkedin
You can also subscribe to this feed or email to stay updated on all posts.

Wednesday, February 23, 2011

Book Review: Death By Meeting

At work our library is near our cafeteria so while heating up lunch I often sneak over to the library to browse. The other day this book title "Death By Meeting" caught my eye. While meetings are an essential to effective management of organizations, they seem to be a source of tension, struggle and ineffectiveness.



Death By Meeting (2004) is the work of Patrick Lencioni, a business consulting guru with a number of top-selling books to his credit. Most of the book is a fable about a video game company with really good people and really bad meetings. I’ll skip over the story and get right to the take home points. Lencioni highlights two problems with meetings.The first problem is this: meetings are boring. And the second is like it: meetings are ineffective. Meetings, says Lencioni, are boring because they lack drama. They are ineffective because they lack contextual structure.

The key to making meetings more engaging - and less boring - lies in identifying and nurturing the natural level of conflict that should exist. Leaders of meetings need to put the right issues - often the most controversial ones - on the table at the beginning of their meetings. By demanding that their people wrestle with those issues until resolution has been achieved, they can create genuine, compelling drama, and prevent their team from checking out.


Unfortunately, no amount of drama will matter if leaders don't create the right context for their meetings.  The single biggest structural problem facing leaders of meetings is the tendency to throw every iss in the same meeting.  Desperate to minimise wasted time, leaders decide that they will have one big staff meeting once a week or every other week.  This just ensures the meeting will be ineffectice and unsatisfying.  There should be different meetings for different purposes:




If you add up all of the time that these meetings require it amounts to approximately twenty percent of a leader's time. I am sure leaders spend more time than this in meetings.  But they need to ask themselves a basic question. "What is more important than meetings?" If they say "sales" or "e-mail" or "product design," then maybe they should reconsider their roles as leaders and go back to an individual contributor position. If you think about it, a leader who hates meetings is a lot like a surgeon who hates operating on people, or a symphony conductor who hates concerts. Meetings are what leaders do, and the solution to bad meetings is not the elimination of them, but rather the transformation of them into meaningful, engaging and relevant activities.

If you haven't read Death By Meeting I think you will enjoy it and hopefully get a better sense on how to improve your meetings. The approach in this book is similiar to the tiers of meetings that David Mann describes in Creating a Lean Culture. In my experience this works.  Mettings help us communicate but that doesn't mean just getting together is productive. The goal is to create a system that makes our meetings effective and efficient.


Tuesday, February 22, 2011

My Day Job as a Lean Practitioner at OFS

Many of you may wonder what I do when I am not writing blog posts. Well, I practice what I preach. I am a Lean Practitioner (Lean Manufucturing Leader) at OFS Speciatly Photonics Division. I am responsible for teaching Lean thinking principles and countermeasure techniques while ensuring we continue our journey in pursuit of "True North". Below is a short introduction to OFS.

We're OFS Specialty Photonics Division, a leader in developing fiber optic solutions for the medical, industrial, telecommunications, government, aerospace, defense, and transportation industries. The OFS name may be new to you . . . but we have a hundred-year heritage of technology innovation . . . one of the world's oldest and largest body of expertise in optical fiber solutions.





Stay connect to A Lean Journey on our Facebook page or LinkedIn group.
Follow me on Twitter or connect with me on Linkedin
You can also subscribe to this feed or email to stay updated on all posts.

Monday, February 21, 2011

Adopt Seventeen Principles to Remove Wasted Movement

Motion waste occurs when people move without adding value to the product.  This type of waste includes all the motion in operator's bodies that occurs when they process materials:  foot and hand motion, and torso movements such as bending, reaching, lifting, and so on.  Hiroyuki Hirano defined waste as "everything that is not absolutely essential."  To remove this waste, the action itself may need to be improved or the setup of the operations might need to be improved.

The rule of thumb for minimizing movement is to begin with the largest motions first - the arms, legs, and torso - and then gradually focus on smaller and smaller types of motion - hands, wrists, fingers, and head.  Hiroyuki Hirano offers seventeen principles for identifying and reducing waste during operations:

1. Start and stop manual operations using both hands in unison.
2. Keep arm motions simultaneous and symmetrical, the way you do when you are swimming - arms move in opposite directions with the same timing.
3. Minimize leg and torso motions.  In assembly lines workers must often walk to the parts storage shelves and then back to the assembly area, or at the very least must  twist to lift from a nearby cart or shelf, or reach to a shelf above the work area.
4. Use gravity instead of muscle power.
5. Avoid motions that zigzag or turn sharply.
6. Make motions rhythmical.  Find a rhythm for your work that is easy to maintain over time.
7. Ensure good posture and easy, fluid motions.  Bending over to work on a low table of straining to work on a surface that is too high for you will make your work harder and lead to other types of waste.
8. Use the feet, too; for instance, to operate foot switches to lift parts or move materials to and away from you.
9. Keep all necessary materials and tools close to you and in front of you.
10. Place materials and tools in their order of use.  You can only do this if 5S is implemented and only a few parts are fed to your work area at a time.
11. Use inexpensive sources of power to feed materials through the operation.
12. Keep work tables and equipment at operator height.
13. Make the work environment comfortable.
14. Let the feet work for switching operations, keeping the hands free.
15. Minimize tool variety by integrating tool functions wherever possible.
16. All materials and parts should be easy to pick up, below chest level, and containers should be within easy reach.
17. All handles and knobs should be in convenient locations and in easy-to-grasp shapes.  All handles and switches should be within easy reach without moving the torso.

This focus on body motion is not just about reducing cycle time and establishing production flow, though these are very important results of such improvement activities.  Most people rejoice when they discover ways to eliminate the need to lift heavy items or overreach for tools and materials in order to do their jobs.

Stay connect to A Lean Journey on our Facebook page or LinkedIn group.
Follow me on Twitter or connect with me on Linkedin
You can also subscribe to this feed or email to stay updated on all posts.

Friday, February 18, 2011

Lean Quote: Small Improvements are a Sustainable Competitive Advantage

On Fridays I will post a Lean related Quote. Throughout our lifetimes many people touch our lives and leave us with words of wisdom. These can both be a source of new learning and also a point to pause and reflect upon lessons we have learned. Within Lean active learning is an important aspect on this journey because without learning we can not improve.


"I long to accomplish great and noble tasks, but it is my chief duty to accomplish humble tasks as though they were great and noble. The world is moved along, not only by the mighty shoves of its heroes, but also by the aggregate of the tiny pushes of each honest worker." — Helen Keller

Many times I find a quote and write about how the quote teaches some Lean lesson.  But in this case I have a lesson for which I found a quote.  I'll talk a little more about towards the end.

A family member of mine works at a hospital that is just starting their Lean transformation. They have been at this organization for about 25 years in a traditional setting.  So this transformation is a big change.  My family member volunteered to get involved early on in the Lean training and initiatives.  I would like to think that I helped to create this curiosity with all my talk about Lean.  Nonetheless in a conversation the other day he was telling me about his first project.  So coming out of some Kaizen event training the teacher wants to see the student apply the training.  This is what most of us would expect.  Here comes the twist.  They want to see an improvement of $100,000.  My simple response was that is not Lean more L.A.M.E. (Lean As Misguidedly Executed).  Now I can understand that the leaders want to show that Lean will work and that obviously in the beginning these types of improvements are possible but this is not sustainable.

In the spirit of doing better, the smallest ideas are likely to be the easiest to adopt and implement. These improvements are sometimes called Point or Mini Kaizen. Making one small change is both rewarding to the person making the change and if communicated to others can lead to a widespread adoption of the improvement and the possibility that someone will improve on what has already been improved. There's no telling what might occur if this were the everyday habit of all team members.

One of the most counter intuitive facts about small ideas is that they can actually provide a business with more sustainable competitive advantages than big ideas. The bigger the ideas, the more likely competitors will copy or counter them. If new ideas affect the company's products or services, they're directly visible and often widely advertised.  And even if they involve behind-the-scenes improvements--say, to a major system or process--they're often copied just as quickly. That's because big, internal initiatives typically require outside sources, such as suppliers, contractors, and consultants, who sell their products and services to other companies, too.  Small ideas, on the other hand, are much less likely to migrate to competitors--and even if they do, they're often too specific to be useful.  Because most small ideas remain proprietary, large numbers of them can accumulate into a big, competitive advantage that is sustainable. That edge often means the difference between success and failure.

In a Lean enterprise a strategy of making small, incremental improvements every day, rather than trying to find a monumental improvement once or twice a year equates to a colossal competitive advantage over time and competitors cannot copy these compounded small improvements.

Now back to the quote.  While trying to find a quote to embody this thinking I came across this quote by Helen Keller.  It expresses the importance of being modest and courteously respectful in our work.  Greatness comes not from from a large effort of a few but rather from many tiny efforts from everyone.  Helen Keller may not have been a Lean thinker but she certainly reflects Lean thinking in this phrase.


Stay connect to A Lean Journey on our Facebook page or LinkedIn group.
Follow me on Twitter or connect with me on Linkedin
You can also subscribe to this feed or email to stay updated on all posts.

Wednesday, February 16, 2011

Book Review: Leading Change

Okay, this isn't a new book but nonetheless one I recently read.  Actually, when it first came out I wasn't even in manufacturing and I am not sure it would have made sense.  But having been part of a number of Lean transformations including leading them myself when I saw this book on the shelf I felt compelled to read it.



Leading Change
was first published in 1996 by John P. Kotter after writing an article 1994 called "Leading Change: Why Transformation Efforts Fail."  John a professor from Harvard Business School has been studying change for over 30 years.  His research led to the identification of eight common errors to transformation efforts.


Some of the most common mistakes when transforming an organization are: (1) Allowing too much complacency, (2) Failing to create a sufficiently powerful guiding coalition, (3) Underestimating the power of vision, (4) Under communicating the vision by a factor of 10x-100x, (5) Permitting obstacles to block the new vision, (6) Failing to create short-term wins, (7) Declaring victory too soon, (8) Neglecting to anchor changes firmly in the corporate culture.  He found these errors amplify in a rapid moving competitive world.  John explains that these errors can be mitigated and possibly avoided with the eight stage change process

The 8 Steps of Successful Change and Common Mistakes
Step
Step Lessons from successes
Lessons from mistakes
1
Establish a sense of urgency.
• Examine market and competitive realities.
• Identify and discuss crises, potential crises, or major opportunities.
Not establishing enough sense of urgency.
• Transformation programs require aggressive co-operation by many individuals.
• Without motivation, people won't help and the effort goes nowhere.
2
Form a powerful guiding coalition team.
• Assemble a group with enough energy and authority to lead the change effort.
• Encourage this group to work together as a team.
Not creating a powerful guiding coalition.
• Companies that fail in this phase usually underestimate the difficulties of producing change and thus the importance of a guiding coalition with energy and authority.
3
Create a clear vision expressed simply.
• Create a vision to direct the change effort.
• Develop strategies for achieving the vision.
Lacking a clear vision.
• Without a clear and sensible vision, a transformation effort can easily dissolve into a list of confusing and incompatible projects that can take the organization in the wrong direction or nowhere at all.
4
Communicate the vision.
• Use every possible means to communicate the new vision and strategies.
• Teach new behaviors using the example of the guiding coalition team.
Under-communicating the vision.
• Transformation is impossible unless hundreds or thousands of people are willing to help, often to the point of making short-term sacrifices.
5
Empower others to act on the vision.
• Get rid of obstacles to change.
• Change systems or structures that seriously undermine the vision.
• Encourage risk taking and nontraditional ideas, activities, and actions.
Not removing obstacles to the new vision.
• Obstacles can be: the organizational structure, narrowly defined job categories, compensation or
performance-appraisal systems, and, worst of all, bosses who refuse to change
and make demands that are inconsistent with the overall change vision.
6
Plan for and creating short-term wins.
• Plan for visible performance improvements.
• Create those improvements.
• Recognize and reward employees involved in the improvements.
Not systematically planning and creating short-term wins.
• Planning and creating short-term wins is different from hoping for short-term wins. The former is active, the latter passive.
• Actively look for ways to obtain clear performance improvements, establish goals in the yearly planning system, achieve the objectives, and reward the people involved with recognition, promotions, or money.
7
Consolidate improvements and producing still more change.
• Use increased credibility to change systems, structures, and policies that don't fit the vision.
• Hire, promote, and develop employees who can implement the vision.
• Reinvigorate the process with new projects, themes, and change agents.
Declaring victory too soon.
• Instead of declaring victory, leaders of successful change efforts use the credibility afforded by the short-term wins to tackle even bigger problems.
8
Institutionalize the new approaches.
• Articulate the connections between the new behaviors and corporate success.
• Develop ways to ensure leadership development and succession.
Not anchoring changes in the corporation's culture.
• Change sticks when it becomes the way we do things around here, when it becomes part of the corporate culture.
• Until new behaviors are rooted in social norms and shared values, they are subject to degradation as soon as the pressure for change is removed.


John stresses that successful change of any magnitude goes through all 8 stages, usually in sequence.  The progression is necessary because without a solid base you almost always get problems.  And without the follow-through that takes place in step 8, you never get to the finish line and make change stick.

Having led transformations myself this echoes the process I have used without necessarily knowing it.  I learned a lot from this book and it has caused me to reflect on those transformations.  The book is full of examples and practical advice everyone can use.

Although Kotter's book first came out in 1996, it's as relevant today as it was then.  This is a fantastic book on what it takes to lead change. The examples of the eight mistakes of managing change as well as the eight-step change process can be extremely helpful in learning how to lead change throughout one's organization.














Subscribe to my feed Subscribe via Email LinkedIn Group Facebook Page @TimALeanJourney YouTube Channel SlideShare